Skip Navigation
Photos of Bedford, New Hampshire



This table is used for column layout.
Fee Schedule
TOWN OF BEDFORD PERMIT FEE SCHEDULE
NOTE: AREAS ARE GROSS SQUARE FOOTAGES CALCULATED ON OUTSIDE DIMENSIONS

ALL FEES ARE DUE  AT TIME OF PERMIT ISSUANCE WITH THE EXCEPTION OF PLAN REVIEW FEES WHICH ARE DUE AT TIME OF SUBMISSION.  PERSONAL CHECKS OR CASH (exact amount only) ARE ACCEPTABLE.  PLEASE NOTE: IMPACT FEES MUST BE PAID BY BANK OR CERTIFIED CHECK.

BUILDING PERMIT RATES (does not include system fees - see below)
Minimum for any of below Min $35


1 & 2 family dwellings (includes manufactured & modular)
$.12/SF
1 & 2 family accessory non-occupiable structures & additions (Decks, sheds, gagrages, porches, carports, etc.)
$.10/SF
1 & 2 family accessory occupiable strucutres, additions, remodels
$.12/SF
All other use groups
$.16/SF

CURRENT IMPACT FEE RATES:
(AS OF 6/19/2006)                                                               SCHOOL                          RECREATION
SINGLE FAMILY DETACHED                                  $6,120                          $1,466
TOWNHOUSE                                                           $2,358                          $1,099
DUPLEX (per unit)                                                    $3,652                          $840
MULTI-FAMILY    (per unit)                                      $1,948                          $770
MANUFACTURED HOUSING                                  $3,457                           $726
AGE 55+ (per unit w/o restrictive covenants)       20% of above fees     same as above
AGE 55+ (per unit w/ "no children" covenants)    $0                       same as above
AGE 62 & >, ASSISTED LIVING
        & NURSING HOMES                                         $0                                      $0


PLAN REVIEW FEES
Review fees are due upon submission of application. Review fees are required for all new dwellings, new commercial structures, residential additions / major remodels (of the occupied space) or major commercial remodels / change of use group. These fees do not apply to applications for sheds, swimming pools, decks, minor tenant fit ups under 10,000 sq ft and similar types of applications.

Residential (R-3) $ 35.00 per unit
All other Use Groups $ 100.00 per building

Once approval is granted for a permit and a major plan change occurs (more than 25% of the building area affected) the revision will incur an additional review fee and may require an adjustment to the permit fee for the project.

BUILDING PERMIT RENEWAL
This would become effective only if no inspections are requested within 180 days after the permit issued or more than 180 days pass between
inspections.
1st Renewal 25% of original fee
2nd and subsequent Renewals 50% of original fee
NOTE: Permit renewals must be requested in writing and just cause shown for the extension request. The extension fees must be paid prior to inspection requests for expired permits.


COMMERCIAL KITCHEN HOOD EXHAUST SYSTEMS (installation, replacement, alteration) $25

DEMOLITION
Residential (1 & 2 family dwelling) $35
All other use groups $100

DISPLAY PROCESSES / CARNIVALS $25

DRILLING / BLASTING $25

ELECTRICAL WIRING - minimum fee $25
new installation, replacement, alteration
all 1 & 2 family work
$.012/SF
all others
$.016/SF
ELECTRIC SERVICE - new or upgrade

Up to & including 200A
$ 25.00/meter socket
201A through 1000A
$ 100.00/meter socket
1001A and over
$ 250.00 / meter socket
FINES - NOTE: THESE FINES ARE SEPERATE FROM PENALTIES PERMITED UNDER THE ZONING REGULATIONS

Starting work without a permit - (this includes foundation excavation)
Double the permit fee or a minimum of $100
Failure to secure required inspections (offenses are cumulative)
1st offense
warning
2nd offense -
$25
3rd offense
$50
all subsequent offenses
$ 100 each

FIRE ALARM 0.016/SF
(installation, replacement, alteration) Min $25

FIREPLACES OR CHIMNEYS(any construction material or fuel) $25

FUEL STORAGE TANKS (500 gal or more capacity) $25 / Tank
(installation / removal of exposed / buried)

GAS / OIL FIRED BURNERS $25 / unit
(installation, replacement, alteration - includes hot water heaters)

GAS PIPING (installation) $10/appliance
Min $25

OUTDOOR SPORTS COURTS $35

PLUMBING 0.012/SF for R-3
(installation, replacement, alteration) 0.016/SF all others
Min $25

SEPTIC SYSTEMS
Complete rebuild or Installation (new) $35/system (does not include cost of electrical permit for pumps)
Leachfield In-Kind $50/field
Septic Tank only $15/tank
Letter to Expedite (this fee is in addition to review fee) $ 25.00/system
Plan review prior to submission to D.E.S. $ 25.00/per plan

SIGNS
Illuminated $75
Non-illuminated $50

SPRINKLER SYSTEMS (FIRE SUPPRESSION) 0.016/SF
(Installation, replacement, alteration) Min $25

SWIMMING POOLS (includes electric permit)
IN-Ground $75
Above Ground $50

TEMPORARY MANUFACTURING $25

TENTS
Residential $10 / Tent
Commercial $25 / Tent

Photo of Tower
Town of Bedford
Bedford Town Offices   24 North Amherst Road, Bedford, NH 03110      Phone: (603) 472-5242
Website Disclaimer      Privacy Statement      Virtual Town Hall Website